Opportunity · Visakhapatnam, Andhra Pradesh

Project Andhra Kendram

A greenfield site taken to Ready-to-Build in India's fastest-growing data-centre corridor — suited to a hyperscale or AI-native campus, or to a colocation operator serving the demand that follows the hyperscalers in.

Corridor pipeline
6 GW

State ambition, as reported

Anchor committed
~US$15B

Google AI hub, ground broken April 2026

Leasable supply
Minimal

Pipeline is almost entirely self-build

Delivery stage
Greenfield → RTB

The Vastra scope

The gap

The anchor is committed. Leasable capacity is not.

Visakhapatnam's announced pipeline is concentrated in a small number of very large, self-build campuses on multi-year timelines. It anchors the corridor, the subsea gateway and the grid, and it creates a cluster. It does not create leasable capacity for the operators, global capability centres and enterprises that will follow the hyperscalers in.

That is the gap Project Andhra Kendram is positioned to fill — and a site that arrives with bankable power, aggregated land, assured water and cleared approvals converts announced megawatts into live megawatts.

Why Visakhapatnam

Chosen deliberately, for export-grade, AI-scale fundamentals.

A subsea gateway

A deep-water coast with new subsea cable landings, giving low-latency, export-grade international connectivity.

Abundant clean power

Among India's strongest renewable and pumped-storage positions, able to supply firm, low-carbon power at gigawatt scale.

A proactive government

A clear data centre policy and a state actively facilitating large investment, with concessional land, power and water.

An emerging cluster

Marquee investments are landing now, so the ecosystem, connectivity and supply chain are forming around the corridor.

Coastal cooling options

Seawater and desalination-based cooling suit water-efficient, high-density AI facilities on the coast.

A growing talent base

An expanding technology and global-capability-centre workforce, with academia aligning to industry needs.

Site template

What a world-class data centre needs.

The site and infrastructure a hyperscale, AI-ready campus requires. We would value the government's guidance on what can be provided in the Visakhapatnam corridor.

RequirementIndicative need (per ~100 MW, scalable)
LandContiguous, buildable, non-agricultural or convertible land, scalable to a multi-hundred-MW campus (indicatively 25 to 100+ acres)
PowerFirm, dual-source grid intake (indicatively 130+ MVA per 100 MW) from a nearby 220 / 400 kV substation, with open access and renewable or captive options
WaterAssured supply (indicatively ~6 million litres a day per 100 MW), with seawater or desalination options for cooling
ConnectivityProximity to subsea cable landing stations and multiple diverse fibre routes
ApprovalsSingle-window clearance, fast-track mega-project status, and the required NOCs
ResilienceLow flood exposure and a stable seismic profile, with climate-resilient siting
Partnership with the state

Andhra Pradesh's Data Centre Policy 4.0

Andhra Pradesh's Data Centre Policy 4.0 and its industrial and clean-energy policies offer a strong foundation. To bring this investment to Visakhapatnam, we would value support across the following.

Land
Allotment on concessional terms, with land-use conversion where needed, in or near a data centre cluster
Power
Allocation and grid connectivity, electricity-duty exemption and tariff support, open access, and a deemed distribution licence for direct procurement
Water
Assured allocation, an industrial-water concession, and support for seawater or desalination-based cooling
Approvals
Single-window facilitation, fast-track clearances, and infrastructure status
Fiscal
The incentives available under AP Data Centre Policy 4.0, including SGST reimbursement and capital subsidy

In return, Andhra Pradesh backs a financed, buildable project delivered by an experienced team — not another idle allocation.

Impact

What this delivers for Andhra Pradesh.

Anchor investment

A multi-hundred-million to billion-dollar campus, funded by global institutional capital, not a speculative allocation.

Jobs at every level

Construction and civil trades, data centre operations, high-skill engineering and AI and cloud roles, and allied services.

Capacity and capability

Export-grade, AI-ready compute that strengthens Visakhapatnam as a national and international data centre hub.

Both markets served

Domestic data-localisation and enterprise demand, and international and AI workloads over the coast's subsea routes.

A catalyst, not just a building.

A single hyperscale campus anchors a wider ecosystem: the clean-energy build-out that powers it, the connectivity that serves it, the global capability centres and enterprises it attracts, and the skilling and academic partnerships that supply its workforce. Delivered by an experienced team with committed capital behind it, it helps position Visakhapatnam among the country's leading data centre destinations.

Our commitment: a real, financed, buildable project in Visakhapatnam, backed by global capital and a proven operator, delivering investment and jobs to Andhra Pradesh.

Publicly reported and company-announced figures, as of mid-2026. Items described as reported are press-reported and not independently confirmed. Public projects referenced are not Vastra counterparties. Figures are indicative and subject to verification.